和平软启动器安装及维修说明书
声明:您必须遵守我们的协议,如果您下载了该资源行为将被视为对《电天下账号管理规范》全部内容的认可,本网站资源来自原创,仅供用于学习和交流,请勿用于商业用途。如有侵权、不妥之处,请举报本资源,我们将及时审核处理!
和平软启动器安装及维修说明书。
文本预览
Installation and maintenance Instruction
Hapn softstarter range
HPS2 S18/30 300/515Contents
1. Softstarter Marking 3
2. Mounting 4
Drilling plan 4
Minimum distance to wall / front 4
3. Connection 5
3.1 1L1 3L2 5L3 Main circuit Bar 1L1,3L2,5L3 as well as
2T1 4T2 6T3 2T1,4T2 and 6T3. 5
3.2 Control voltage and control circuit 6
4. Setting 9
4.1 Start ramp 9
4.2 Stop ramp 9
4.3 Initial voltage(U INI) / Current limit function (I LIM) 9
4.4 Switch for selection of connection type,
Line / Delta switch S1 10
4.5 Basic settings for different applications 11
5. Maintenance 12
6. Trouble Shooting 12
7. Technical Data 15
7.1 Dimensions 15
7.2 Circuit diagram 16
WARNING
Morethanonelivecircuit-seediagram
Donotoperatemachinewiththegroundingwiredisconnected
WARNING
Theoperation,installationandservicingofthisproductmustbecarriedoutbyaqualifiedelectrician,
followinginstallationstandardsandsafetyregulations.Checkthatyouhavethecorrectsoftstarter
unitinregardstonetvoltage,ratedmotordataandtypeofconnection.
21. Softstarter Marking
89/336/ These softstarters fulfil the
EEC EN 60947-4-2/ demands according to 89/336/EEC
IEC 947-4-2 A and EN 60947-4-2 / IEC 947-4-2,
Equipment class A.
Electric
HPS2S
Type
Rated current range
:
KW Ue :
Mainvoltage level and kW rating ln-line
:
inside-delta
Supply voltage
CE UL
Data according to CE and UL
!
WARN
Do operation by regulation.
Inspection should be perfromed atter cut off power.
E
Thepote E must be Connectedto ground.
Us
Supply voltage Us
1 2 3 4 5 6 7 8 9 10 11 12
I Iim
HPS2 Softstart
ON Green
TOPOF RAMP Green
GENERALFAULT Red
EXTERNALFAULT Red
1L1 3L2 5L3
Terminal marking
of main circuit
2T1 4T2 6T3
Picture 1.13. Connection
3.1 / Main circuit,Terminal/Bar L1 L2 L3
1L1 3L2 5L3 1L1,3L2,5L3 as well as
1L13L25L3
2T1 4T2 6T3 2T1,4T2,6T3. HPS2S
2T14T26T3
All softstarters,HPS2S18/30 to HPS2S300/ V1
515,can be connected both ln Line
U1MW1
(see picture3.1)and lnside Delta (see
picture 3.2,alt.1 and 2)with the motor.
L1 L2 L3 L1 L2 L3
Line / Delta S1 Remember to set the Line/Delta
10 switch S1 in the right position. 1L13L25L3 1L13L25L3
See further on page 10. HPS2S HPS2S
2T14T26T3 2T14T26T3
W1 W2 W1 W2
For mounting of a current trans- V1 M V2 V1 M V2
8 3 .2.6 former for the current limit U1 U2 U1 U2
function,see further instructions
section 3.2.6 on page 8.
Connect the line side to terminals/bars
1L1,3L2,5L3 and motor side to
terminals / bars 2T1,4T2 and 6T3.The
terminal marking is printed on the
softstarter front label.
The softstarter unit is not phase
sequence sensitive
HPS2 S 18/30-500...44/76-500
1L1 3L2 5L3
5.6
5.6
2T1 4T2 6T3 10
HPS2 S 50/85-500...72/124-500
Hapn softstarter range
HPS2 S18/30 300/515Contents
1. Softstarter Marking 3
2. Mounting 4
Drilling plan 4
Minimum distance to wall / front 4
3. Connection 5
3.1 1L1 3L2 5L3 Main circuit Bar 1L1,3L2,5L3 as well as
2T1 4T2 6T3 2T1,4T2 and 6T3. 5
3.2 Control voltage and control circuit 6
4. Setting 9
4.1 Start ramp 9
4.2 Stop ramp 9
4.3 Initial voltage(U INI) / Current limit function (I LIM) 9
4.4 Switch for selection of connection type,
Line / Delta switch S1 10
4.5 Basic settings for different applications 11
5. Maintenance 12
6. Trouble Shooting 12
7. Technical Data 15
7.1 Dimensions 15
7.2 Circuit diagram 16
WARNING
Morethanonelivecircuit-seediagram
Donotoperatemachinewiththegroundingwiredisconnected
WARNING
Theoperation,installationandservicingofthisproductmustbecarriedoutbyaqualifiedelectrician,
followinginstallationstandardsandsafetyregulations.Checkthatyouhavethecorrectsoftstarter
unitinregardstonetvoltage,ratedmotordataandtypeofconnection.
21. Softstarter Marking
89/336/ These softstarters fulfil the
EEC EN 60947-4-2/ demands according to 89/336/EEC
IEC 947-4-2 A and EN 60947-4-2 / IEC 947-4-2,
Equipment class A.
Electric
HPS2S
Type
Rated current range
:
KW Ue :
Mainvoltage level and kW rating ln-line
:
inside-delta
Supply voltage
CE UL
Data according to CE and UL
!
WARN
Do operation by regulation.
Inspection should be perfromed atter cut off power.
E
Thepote E must be Connectedto ground.
Us
Supply voltage Us
1 2 3 4 5 6 7 8 9 10 11 12
I Iim
HPS2 Softstart
ON Green
TOPOF RAMP Green
GENERALFAULT Red
EXTERNALFAULT Red
1L1 3L2 5L3
Terminal marking
of main circuit
2T1 4T2 6T3
Picture 1.13. Connection
3.1 / Main circuit,Terminal/Bar L1 L2 L3
1L1 3L2 5L3 1L1,3L2,5L3 as well as
1L13L25L3
2T1 4T2 6T3 2T1,4T2,6T3. HPS2S
2T14T26T3
All softstarters,HPS2S18/30 to HPS2S300/ V1
515,can be connected both ln Line
U1MW1
(see picture3.1)and lnside Delta (see
picture 3.2,alt.1 and 2)with the motor.
L1 L2 L3 L1 L2 L3
Line / Delta S1 Remember to set the Line/Delta
10 switch S1 in the right position. 1L13L25L3 1L13L25L3
See further on page 10. HPS2S HPS2S
2T14T26T3 2T14T26T3
W1 W2 W1 W2
For mounting of a current trans- V1 M V2 V1 M V2
8 3 .2.6 former for the current limit U1 U2 U1 U2
function,see further instructions
section 3.2.6 on page 8.
Connect the line side to terminals/bars
1L1,3L2,5L3 and motor side to
terminals / bars 2T1,4T2 and 6T3.The
terminal marking is printed on the
softstarter front label.
The softstarter unit is not phase
sequence sensitive
HPS2 S 18/30-500...44/76-500
1L1 3L2 5L3
5.6
5.6
2T1 4T2 6T3 10
HPS2 S 50/85-500...72/124-500
AIGC
尊敬的用户,您好!关于"和平软启动器安装及维修说明书",这是一份详细的指南,它包含了和平品牌软启动器的安装步骤、操作方法、注意事项以及在使用过程中可能出现的问题的解决办法。这份手册通常包括以下几个部分:
1. **产品概述**:介绍软启动器的基本特性、型号和适用范围。
2. **安装步骤**:指导用户如何正确地定位、接线和固定软启动器到电源和负载设备上。
3. **接线图示**:提供清晰的接线示意图,帮助用户理解各个端子的功能。
4. **操作说明**:说明如何通过面板或控制面板设置启动参数,如频率、时间等。
5. **故障诊断**:列出常见的问题及其可能的原因,以及相应的排查和修理方法。
6. **维护保养**:提供定期检查和维护软启动器的建议,延长其使用寿命。
如果您在安装或维修过程中遇到任何问题,欢迎随时向我提问,我会尽我所能提供帮助。祝您安装顺利,使用愉快!